What We Did:
Chief Complain of Mobility in the teeth.
Missing Teeth
Root recession
Surgical Phase
All the teeth extracted under local anesthesia without pain
Implant placed with good primary stability
sutures taken
Temporary prosthesis given.
Total Time Duration of One Week Required.
Prosthesic Phase.
After Healing of 4 Months
Indirect impression taken
Jig Trial taken
CAD CAM Milled Titanium Framework Checked.
Cad Cam Ceramic Teeth Prepared
Prosthesis Delivery and Checkup
All the Implant Tightened at 30NCM torque.
Prosthesis Occlusion checked.
Ceramic Bridge Luting done with Cement.
Happy Smiling Patient